

Recent Concrete & Demolition Projects in Southern California
Take a peek at some of our completed projects, and happy clients!


Bank Of America Cathedral City
We completed 21 bollards at Cat City BoA, what did it take? 21 Cores Drilled, excavation of footings, haul aways, disposal, rebar cages, bollards and concrete in Riverside County, CA.
Bank Of America Corona
We completed 17 bollards and 2 new fresh ADA compliant ramps in Riverside County, CA. This included saw cutting and demolition of existing concrete and asphalt in Southern California.


.jpeg)
Bank Of America Glendale
We completed 6 bollards for BoA Glendale. Our work included core drilling, excavation, disposal and concrete in Los Angeles County, CA
Bank Of America Lake Elsinore
The project required 10 bollards and 50LF of 3' wide V - Gutter to make it ADA compliant in Lake Elsinore. Our work was completed on schedule and passed all inspections.



![IMG_2699[1].JPG](https://static.wixstatic.com/media/26b670_511bbffa831f4e6baa01045e2c9b689a~mv2.jpg/v1/fill/w_261,h_195,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_2699%5B1%5D_JPG.jpg)

Sidewalk Restoration Santa Clarita
Emergency sidewalk restoration project, we were able to mobilize in just a few hours, this included demolition, form work, and concrete finish to match existing in Los Angeles County, CA
The Melt Long Beach
Our most recent T.I. slab for The Melt Long Beach. This project required. epoxy doweling, subgrade preparation, vapor barrier, 8 highly trained individuals, rebar, saw cut joints and a hard power trowel finish in Los Angeles County, CA
.jpeg)

